Commission approves determination for Cross Street project
Conservation Commission · Meeting of April 13, 2026
Deerfield Conservation Commission approves determination for Cross Street house project. The commission approved a Form 2 negative determination for applicant Jeremy Ober's proposed 1,400-square-foot ranch home on Map 169, Lot 79, allowing construction to proceed with erosion-control conditions. The determination followed a site inspection that revealed a hydraulic connection to nearby wetlands on state DEP mapping but concluded no wetland delineation was required.
Erosion controls must extend from the Cross Street culvert northerly around the construction area using hay waddle and silt fence; foundation height will be determined by water-table depth during excavation.
In the full story:
- The complete report — 283 words
Source: the Conservation Commission meeting of April 13, 2026, reported from the official video recording and transcript.
Keep reading with a 14-day free trial
Subscribe to Deerfield News to keep reading this post and get 14 days of free access to the full post archives.
A subscription gets you:
- Subscriber-only posts and full archive
- Post comments and join the community
- 24x7 access to local news